2019, Rapporto di progetto (Project report), ENG
Dalla Palma M.; Brombin M.; Tollin M.; Zaupa M.
The preliminary assembly plan prepared by ITER Organization [R1] describes the SBD interfaces, but it requires to be integrated by another document as lifting, drawing up, and positioning have to be carried out by using a lifting jig. Existing documents regarding SBD handling and installation have been analysed and remaining issues have been addressed as described in the present document. The on-site acceptance test plan has been developed considering component characteristics, installed sensors, and analysed risks [A1].
2017, Rapporto di progetto (Project report), ENG
Dalla Palma M.; Brombin M.; Tollin M.; Zaupa M.
The preliminary assembly plan prepared by ITER Organization [R1] describes the SBD interfaces, but it requires to be integrated by another document as lifting, drawing up, and positioning have to be carried out by using a lifting jig. Existing documents regarding SBD handling and installation have been analysed and remaining issues have been addressed as described in the present document.