Rapporto di progetto (Project report), 2019, ENG
Barzon A.; Cervaro V.; Dalla Palma M.; Degli Agostini F.; Fasolo D.; Fincato M.; Grando L.; Pasqualotto R.; Rossetto F.; Tollin M.; Zaupa M.
Consorzio RFX (CNR, ENEA, INFN, Università di Padova, Acciaierie Venete SpA), Corso Stati Uniti 4 - 35127 Padova, Italy.
The aim of this report is to describe the preparatory activities including modifications performed to the SPIDER Beam Dump (SDB) before the installation of the component on the vessel front lid. These modifications have been implemented to fix issues discovered on site checking the interfaces. Then, the Beam Dump installation of the vessel has been executed as documented in the second part of this document. Finally, data for the procurement of spare cooling bellows are provided.
NBTF, neutral beam test facility, SPIDER, SPIDER beam dump
Cervaro Vannino, Fincato Michele, Grando Luca, Dalla Palma Mauro, Rossetto Federico, Degli Agostini Fabio, Pasqualotto Roberto
IGI – Istituto gas ionizzati, ISTP – Istituto per la Scienza e Tecnologia dei Plasmi
ID: 408279
Year: 2019
Type: Rapporto di progetto (Project report)
Creation: 2019-10-23 12:15:26.000
Last update: 2020-08-23 17:16:54.000
EU Projects
External links
OAI-PMH: Dublin Core
OAI-PMH: Mods
OAI-PMH: RDF
URL: https://portal.igi.cnr.it/sites/default/files/RFX-SPIDER-TN-466.pdf
External IDs
CNR OAI-PMH: oai:it.cnr:prodotti:408279