Rapporto di progetto (Project report), 2019, ENG
Dalla Palma M.; Brombin M.; Tollin M.; Zaupa M.
Consorzio RFX (CNR, ENEA, INFN, Università di Padova, Acciaierie Venete SpA), Corso Stati Uniti 4 - 35127 Padova, Italy.
The preliminary assembly plan prepared by ITER Organization [R1] describes the SBD interfaces, but it requires to be integrated by another document as lifting, drawing up, and positioning have to be carried out by using a lifting jig. Existing documents regarding SBD handling and installation have been analysed and remaining issues have been addressed as described in the present document. The on-site acceptance test plan has been developed considering component characteristics, installed sensors, and analysed risks [A1].
NBTF, neutral beam test facility, SPIDER, SPIDER Assembly
Brombin Matteo, Dalla Palma Mauro
ID: 408702
Year: 2019
Type: Rapporto di progetto (Project report)
Creation: 2019-10-31 14:18:00.000
Last update: 2023-06-30 13:15:20.000
CNR authors
CNR institutes
EU Projects
External links
OAI-PMH: Dublin Core
OAI-PMH: Mods
OAI-PMH: RDF
URL: https://portal.igi.cnr.it/sites/default/files/RFX-SPIDER-TN-460rev1.pdf
External IDs
CNR OAI-PMH: oai:it.cnr:prodotti:408702